Radar Tower – Hal-Far

Our office is the local representative of Selex SI S.p.A who were the main contractors for this Air Traffic Control Radar which was completed in May 2013.
Our team was responsible for the structural and architectural design, project management and certification of the works.
Despite being constrained by the utilitarian aspect of the building, strict budgetary constraints and structural and seismic considerations, we have created a design which is dynamic and bold, creating an interesting landmark in a dull industrial area.